Contractor list


Contractors have been assessed on their ability and capability to undertake 3-Waters Connections at varying levels of difficulty from simple to complex. See "categories" information below.

 

Contact Details Pre-Qualification Category
Company Website Admin Ph: Stormwater Wastewater Water
Allen United Drainage & Earthworks Ltd www.audrainage.co.nz 027 622 6277 A,B,C A,B,C D,E,F
Base Civil Ltd www.basecivil.co.nz 07 847 7233 A,B A,B D,E
Cambridge Excavator Ltd (CAMEX) www.camexcivil.co.nz 07 823 4407 A,B A,B D,E,F
CB Civil Ltd www.cbcivil.co.nz 021 567 448 A,B,C A,B,C D
Civtec Ltd www.civtec.co.nz 0800 248832 A,B A,B D,E,F
HEB Construction Ltd www.heb.co.nz 07 849 0392 A,B,C A,B,C D,E
HiFlow Civil Ltd www.hiflow.co.nz 021 444 458 A,B A,B D,E
J&R Contracting Ltd www.jrcontracting.co.nz 022 010 0149 A A D,E
Jamark Plumbing Ltd www.jamarkplumbing.co.nz 07 834 3180 A,B A,B  
JC Civil Construction Ltd www.jccivil.co.nz 0275 224 140 A,B,C A,B,C D
NIVEC Civils Ltd www.niveccivils.co.nz 021 976 687 A A D,E
Odlum Group Ltd www.odlumgroup.com 07 889 6075 A,B,C A,B,C D,E,F
Phoenix Civil Ltd www.phoenixcivil.co.nz 021 570 389 A,B,C A,B,C D,E
Pemberton Group (Hamilton) Ltd www.pemberton-civil.co.nz 07 850 1042 A A D
Schick Civil Construction Ltd www.schick.co.nz 021 240 1809 A,B,C A,B,C D,E,F
Smythe Contractors Ltd www.smythecon.co.nz 07 827 5925 A,B,C A,B,C D,E,F
Waipa Civil Ltd www.waipacivil.co.nz 07 827 5269 A,B,C A,B,C D,E,F
WEST Construction (2011) Ltd www.westconstruction.co.nz 027 270 5872 A,B A,B D,E,F
Wolfpack Construction Ltd www.wpconstruction.co.nz 0800 965 375 A,B A,B D,E
Wright Civil Construction Ltd www.wrightcivil.co.nz 09 296 7777 A,B A,B  

3-Waters Connections Categories

  Wastewater and Stormwater Water
Category A - Simple Complexity B - Medium Complexity C - High Complexity D - Simple Complexity E - Medium Complexity F - High Complexity
Pipe & Manhole Depth Work Undertaken < 1.5m Deep Work Undertaken 1.5m – 3.0m Deep (WorkSafe Notifications required). Confined spaces. Pipe relay/replacement. Ground water levels to be controlled during construction. Work Undertaken > 3.5m depth or greater (WorkSafe Notifications required). Confined spaces. Pipe relay/replacement, pipeline extension, installation of new line within road corridor. Ground water levels to be controlled. Installation, upgrade, disconnection of 20mm, 25mm connections under live tapping Greenfield development tie-ins. Installation of 20mm-150mm requiring shutdown Upgrade of existing water main to accommodate development, installation of new water main within public road corridor e.g. including new connections to service a development
Pipe Size & Material 225mm or less 225mm or less. Asbestos handling. Larger than 225mm. Asbestos handling. 20mm, 25mm, 50mm 150mm, 250mm 50mm, 150mm, 250mm and above
Live Flows Low live flows of WW or SW required Live flows to be maintained for SW & WW Live flows to be maintained for SW & WW   Shutdowns Shutdowns
Location Category A — Local Roads, Private Residential Property Category B Local Roads. Commercial Property Category B&C NZTA Roads, near to open water, protected trees, located within a park or Rail Corridor, close proximity to critical utilities e.g. strategic gas, electricity services Category A - Local Roads, Private Residential Property Category B Local Roads. Commercial Property Category B&C NZTA Roads, near to open water, protected trees, located within a park or Rail Corridor, proximity to critical utilities e.g. strategic gas, electricity services
Share this page

Feedback

Has this page been helpful?
Thanks for your feedback.

Last updated 8 April 2026