Project summary

What we’re doing

We're installing a new signalised pedestrian crossing on Grey Street near Wellington Street and Steele Park. We will also be improving footpaths and pedestrian access, changing some existing parallel parking spaces besides Steele Park on Wellington Street to angled parks, and carrying out landscaping improvements around the crossing. 

Why we’re doing it

The improvements will create a safer and more accessible pedestrian connection across Grey Street to Steele Park and local businesses, while also increasing parking provision in the area.

This project will

  • Make it safer and easier to cross Grey Street

  • Improve accessibility between Grey Street, Steele Park and local businesses

  • Provide more parking in the area

Project features

The work includes:

  • installation of a new signalised pedestrian crossing
  • localised kerb buildouts and associated drainage improvements
  • reconfiguration of existing parallel parking on Wellington Street beside Steele Park to angled parking
  • associated road marking, signage and traffic signal works.  

These improvements have been scheduled to align with Connect Hamilton’s planned resurfacing of Grey Street between Cook Street and Wellington Street, helping minimise disruption to the community and ensuring a tidy finish for all the works.  

View the plans here:

Frequently asked questions

What hours will work take place?

Construction for the crossing and other improvements will generally occur between 7am and 6pm, Monday to Friday. Some Saturday work may be required if needed to keep the project on schedule. The resurfacing is scheduled to begin on the night of Sunday 15 November 2026 and is expected to take up to one week to complete, weather permitting. A full road closure will be in place during resurfacing works, with this work generally occurring between 7pm and 6am.

Will traffic be affected?

During construction of the crossing and other improvements, traffic will be able to continue to travel in both directions on Grey Street, and driveway access to homes and businesses will be maintained. On-street parking will be unavailable within 50 metres of the Grey Street/Wellington Street intersection. There will be no vehicle entry from Grey Street into the eastern part of Wellington Street (next to Steele Park) during the work, with alternative access via Firth Street. Stop/go traffic management will be in place as required to support safe vehicle exits from the western part of Wellington Street (from Hayes Paddock) onto Grey Street.
During the resurfacing works, a full road closure will be in place.

Will access to homes and businesses be maintained?

Yes, access to nearby homes and businesses will be maintained throughout construction. Temporary changes to vehicle or pedestrian access may be required at times, but the project team will work with affected property owners and businesses where necessary. 

Will parking be affected?

Some parking changes will occur as part of the project, including the conversion of some parallel parking spaces beside Steele Park into angled parks. Temporary parking restrictions may also be required during construction. 

Feedback

Has this page been helpful?
Thanks for your feedback.

Last updated 21 October 2026