Project summary

What we're doing

To improve safety and connectivity between the central city, Clarence Street Theatre, PAK'nSAVE and surrounding walking and cycling networks such as Anglesea Street, we are: 

  • Constructing a new ground-level pedestrian and cycle crossing with traffic lights on Tristram Street near the Clarence Street Theatre. 
  • Upgrading the existing crossing on Clarence Street.
  • Constructing a new shared path on Tristram Street.  

Why we’re doing this work

Our central city is growing, and we need to invest in infrastructure to make it easier for people to get around as the number of homes and visitors are expected to increase.  
 
This project is one of many contributing to the wider vision of the Central City Transformation Plan to shape a central city where people love to be.  

Community feedback 

We’ve incorporated a range of local community and business feedback into the final design. Key feedback themes related to truck access, lighting, signal visibility, traffic flow and crossing safety. 

The attached plan shows the locations of the crossings and shared path. 

The project will

  • Make it easier and safer for pedestrians and cyclists to cross the road

  • Provide better central city connections

  • Improve access for older people and people with disabilities

View the full design

Frequently asked questions

How will it be constructed?

Construction is planned to start from Sunday 15 November 2026 and is expected to take about five weeks to complete (weather dependent).  

The hours of work include a combination of:

Night works (1 - 2 weeks)

  • Road closures will be in place from 7pm to 6am along Tristram Street between the Cobham roundabout and the Thackeray roundabout:  
    • A vehicle detour route will be in place via Anglesea Street and Thackeray Street.  
    • The road closure allows the contractor to safely carry out site clearance, excavation and drainage work on and beside the road.
    • Please follow signage and instructions from our work crew.
  • Connect Hamilton will undertake road maintenance resurfacing work on the southbound lane of Tristram Street. 
  • Pedestrian access will be maintained, including crossings at Tristram Street and Clarence Street. 

Day works (4 - 5 weeks)

  • A shoulder closure will be in place on Tristram Street between 7am and 5pm, from Monday 16 November.
  • Traffic on Tristram Street will continue to flow through the work site.
  • Pedestrian access will be maintained, including crossings at Tristram Street and Clarence Street.
  • To safely complete the remaining footpath and berm works, left-in and left-out turning movements at the Clarence and Tristram Streets’ intersections will be closed.
  • Vehicle detour routes will be in place along with appropriate detour signs to guide vehicles.
  • Access to properties and businesses on Clarence Street will be available via Pembroke Street. 

How much will the project cost?

The project including project management, design and construction has an approved budget of $1.14 million. This is funded through the Minor Transport Improvement programme and was approved at the 11 March 2025 Infrastructure and Transport Committee. 

What else is happening in the area?

Several projects are planned within the wider area during the 2026/27 summer construction season.  

The work includes replacing aging water infrastructure, renewing footpaths and improving road surfaces - important for maintaining essential services and supporting growth. We will contact you with further information about these works prior to construction starting. 