ADDITIONAL PLANNING RELATED CHARGES
Service Plan Certification
Service Connection Plan Certification and Vehicle Crossing Plan Certification Any additional hours per hour $240.00
TRADE WASTE
Annual Charge
Permitted/Controlled/Special/Tankered Discharge annual fee $253.00
Conditional/Special/Tankered Discharge - Risk Class 3 annual fee $2,219.00
Conditional/Special/Tankered Discharge - Risk Class 2 annual fee $1,346.00
Any temporary Discharge annual fee $250.00
per sample collected $260.00
Enforcement and penalties
Actual costs
As per agreement
Quantity charge rates for Conditional Consent Holders
a) Flow Volume per m3 $2.22
b) Suspended solids per kg $0.88
c) cBOD5 (Organic loading) per kg $0.82
d) Total Kjeldahl Nitrogen per kg $2.25
e) Total Phosphorous per kg $7.63
f) Arsenic per kg $395.69
COD $0.09
Site Inspection Fees
Permitted/Controlled Discharge - Site Inspection/Audit per site visit $221.00
Conditional Consent - Site Inspection/Audit per site visit $252.00
Temporary Discharge - Inspection/Audit per site visit $252.00
Site Inspection/Audit - Non Compliance per site visit $315.00
Tankered Waste Disposal
Note
1) Tankered waste may not be accepted at the City Waters Manager's sole discretion and
2) Tankered Waste disposal to Wastewater Treatment Plant or reticulation not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw,
3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate.
Tankered Waste disposal to Wastewater Treatment Plant or reticulation in accordance with Trade waste Bylaw schedule 1A and 1B. per m3 $88.00
Tankered waste administrative charge annual fee $862.00
Trade Waste Application Fees
Permitted/Controlled Discharge $331.00
Conditional Consent per application $778.00
Hourly rate for applications per hour $140.00
Temporary Discharge per application $331.00
Renewal Fee for permitted or conditional Trade Waste Consents per application $140.00
Variation / Change of Details Request for Trade waste consents (plus additional hourly rate for more than 30 minutes time noting that site inspection charges may also apply) Per request $70.00
Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees Actual costs
WASTEWATER, STORMWATER AND WATER CONNECTIONS
All “by quote” work includes a Council overhead component of between 4-6%
Catch pit connections
Stormwater Bubble Up Connections by quote
Larger Diameter Connections (>150mm) by quote
Manhole Installation Required by quote
a) 300 diameter by quote
b) full size catch pit for 2 or more properties by quote
Consent to Enter
Basic processing of consent to enter $356.00
Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis per hour $133.00
Inspection fees
Closed Circuit TV Inspection by quote
On site pipe location by quote
Water, wastewater and stormwater connection inspection fee for connections undertaken by an approved contactor Allows for 3 site visits $318.00
Water, wastewater and stormwater connection additional inspection fee for connections undertaken by an approved contractor Per hour $127.00
Modification of existing connection
Relocation of existing connection by quote
Install of flow restrictor by quote
Private systems
All internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner. Actual costs
Customer and Developer queries related to Three Waters connection feasibility and requirements per hour $240.00
Reinstatement
Reinstatement of sealed roadways, footways and light vehicle entrances. by quote
Stormwater
Inspection of high-risk facility minimum charge $587.50
Enforcement of Stormwater Bylaw 2021 Actual costs
Hourly rate for time spent in excess of that allowed for in inspection fee Per hour $235.00
Stormwater and Wastewater connections
100mm Stormwater and Wastewater on Private Property by quote
100mm Stormwater and Wastewater in the Transport Corridor by quote
150mm Stormwater and Wastewater on Private Property by quote
150mm Stormwater and Wastewater in the Transport Corridor by quote
Stormwater Pipes to Kerb and Channel (domestic only)
1 pipe in trench $/m per metre by quote
Third party damages
Damage to services. Actual costs
Upgrades to enable connection.
Upgrades of infrastructure to enable the connection Actual costs
Water connections
Single service connection, 20mm by quote
Single service connection, 25mm by quote
Service connection , 50mm (multi unit residential only) by quote
Single metered, 20 mm by quote
Single metered, 25 mm by quote
Single metered, 50 mm by quote
Multi, 2*20 mm by quote
Multi, 3*20 mm by quote
Multi, 4*20 mm by quote
Water connections 50mm or greater - additional charges
Bacteria testing $384.00
Pressure testing $318.00
Wastewater, Stormwater and Water Connection application fee per 2 hours $329.00
Wastewater, Stormwater and Water Connection application fee Non-standard connections per hour $133.00
WASTEWATER, STORMWATER AND WATER DISCONNECTIONS
All “by quote” work includes a Council overhead component of between 4-6%
Wastewater and Stormwater Disconnection
Wastewater, Stormwater and Water disconnection application fee $329.00
Disconnection by quote
Water service Disconnection
20 - 50 mm diameter by quote
Above 50 mm diameter by quote
Fire mains by quote
Water and Wastewater network capacity screening assessment by engineering team. per hour $240.00
Water and Wastewater network capacity screening assessment by consultant or specialist. Actual costs