ADDITIONAL PLANNING RELATED CHARGES | |||||||||||
Service Plan Certification | |||||||||||
Service Connection Plan Certification and Vehicle Crossing Plan Certification | Any additional hours | per hour | $240.00 |
TRADE WASTE | ||||||||||
Annual Charge | ||||||||||
Permitted/Controlled/Special/Tankered Discharge | annual fee | $253.00 |
Conditional/Special/Tankered Discharge - Risk Class 3 | annual fee | $2,219.00 |
Conditional/Special/Tankered Discharge - Risk Class 2 | annual fee | $1,346.00 |
Any temporary Discharge | annual fee | $250.00 |
per sample collected | $260.00 |
Enforcement and penalties | ||||||||
Actual costs | ||||||||
As per agreement |
Quantity charge rates for Conditional Consent Holders | ||||||||||
a) Flow Volume | per m3 | $2.22 | ||||||||
b) Suspended solids | per kg | $0.88 | ||||||||
c) cBOD5 (Organic loading) | per kg | $0.82 | ||||||||
d) Total Kjeldahl Nitrogen | per kg | $2.25 | ||||||||
e) Total Phosphorous | per kg | $7.63 | ||||||||
f) Arsenic | per kg | $395.69 |
COD | $0.09 |
Site Inspection Fees | ||||||||||
Permitted/Controlled Discharge - Site Inspection/Audit | per site visit | $221.00 | ||||||||
Conditional Consent - Site Inspection/Audit | per site visit | $252.00 | ||||||||
Temporary Discharge - Inspection/Audit | per site visit | $252.00 | ||||||||
Site Inspection/Audit - Non Compliance | per site visit | $315.00 |
Tankered Waste Disposal | ||||||||||||
Note 1) Tankered waste may not be accepted at the City Waters Manager's sole discretion and 2) Tankered Waste disposal to Wastewater Treatment Plant or reticulation not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw, 3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate. | ||||||||||||
Tankered Waste disposal to Wastewater Treatment Plant or reticulation in accordance with Trade waste Bylaw schedule 1A and 1B. | per m3 | $88.00 |
Tankered waste administrative charge | annual fee | $862.00 |
Trade Waste Application Fees | ||||||||||
Permitted/Controlled Discharge | $331.00 |
Conditional Consent | per application | $778.00 |
Hourly rate for applications | per hour | $140.00 |
Temporary Discharge | per application | $331.00 |
Renewal Fee for permitted or conditional Trade Waste Consents | per application | $140.00 |
Variation / Change of Details Request for Trade waste consents (plus additional hourly rate for more than 30 minutes time noting that site inspection charges may also apply) | Per request | $70.00 |
Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees | Actual costs |
WASTEWATER, STORMWATER AND WATER CONNECTIONS | ||||||||||
All “by quote” work includes a Council overhead component of between 4-6% | ||||||||||
Catch pit connections | ||||||||||
Stormwater Bubble Up Connections | by quote | |||||||||
Larger Diameter Connections (>150mm) | by quote | |||||||||
Manhole Installation Required | by quote | |||||||||
a) 300 diameter | by quote | |||||||||
b) full size catch pit for 2 or more properties | by quote | |||||||||
Consent to Enter | ||||||||||
Basic processing of consent to enter | $356.00 |
Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis | per hour | $133.00 |
Inspection fees | ||||||||||
Closed Circuit TV Inspection | by quote | |||||||||
On site pipe location | by quote |
Water, wastewater and stormwater connection inspection fee for connections undertaken by an approved contactor | Allows for 3 site visits | $318.00 |
Water, wastewater and stormwater connection additional inspection fee for connections undertaken by an approved contractor | Per hour | $127.00 |
Modification of existing connection | ||||||||||
Relocation of existing connection | by quote | |||||||||
Install of flow restrictor | by quote |
Private systems | |||||||||||
All internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner. | Actual costs | ||||||||||
Customer and Developer queries related to Three Waters connection feasibility and requirements | per hour | $240.00 | |||||||||
Reinstatement | |||||||||||
Reinstatement of sealed roadways, footways and light vehicle entrances. | by quote | ||||||||||
Stormwater | |||||||||||
Inspection of high-risk facility | minimum charge | $587.50 | |||||||||
Enforcement of Stormwater Bylaw 2021 | Actual costs |
Hourly rate for time spent in excess of that allowed for in inspection fee | Per hour | $235.00 | ||||||||
Stormwater and Wastewater connections | ||||||||||
100mm Stormwater and Wastewater on Private Property | by quote | |||||||||
100mm Stormwater and Wastewater in the Transport Corridor | by quote | |||||||||
150mm Stormwater and Wastewater on Private Property | by quote | |||||||||
150mm Stormwater and Wastewater in the Transport Corridor | by quote |
Stormwater Pipes to Kerb and Channel (domestic only) | |||||||||||
1 pipe in trench $/m | per metre | by quote | |||||||||
Third party damages | |||||||||||
Damage to services. | Actual costs |
Upgrades to enable connection. | ||||||||||
Upgrades of infrastructure to enable the connection | Actual costs | |||||||||
Water connections | ||||||||||
Single service connection, 20mm | by quote | |||||||||
Single service connection, 25mm | by quote | |||||||||
Service connection , 50mm (multi unit residential only) | by quote | |||||||||
Single metered, 20 mm | by quote | |||||||||
Single metered, 25 mm | by quote | |||||||||
Single metered, 50 mm | by quote | |||||||||
Multi, 2*20 mm | by quote | |||||||||
Multi, 3*20 mm | by quote | |||||||||
Multi, 4*20 mm | by quote | |||||||||
Water connections 50mm or greater - additional charges | ||||||||||
Bacteria testing | $384.00 | |||||||||
Pressure testing | $318.00 |
Wastewater, Stormwater and Water Connection application fee | per 2 hours | $329.00 |
Wastewater, Stormwater and Water Connection application fee | Non-standard connections | per hour | $133.00 |
WASTEWATER, STORMWATER AND WATER DISCONNECTIONS | ||||||||||
All “by quote” work includes a Council overhead component of between 4-6% | ||||||||||
Wastewater and Stormwater Disconnection | ||||||||||
Wastewater, Stormwater and Water disconnection application fee | $329.00 | |||||||||
Disconnection | by quote | |||||||||
Water service Disconnection | ||||||||||
20 - 50 mm diameter | by quote | |||||||||
Above 50 mm diameter | by quote | |||||||||
Fire mains | by quote |
Water and Wastewater network capacity screening assessment by engineering team. | per hour | $240.00 |
Water and Wastewater network capacity screening assessment by consultant or specialist. | Actual costs |
Feedback
Last updated 6 July 2022