Water and Wastewater network capacity screening assessment by engineering team. | per hour | Actual cost |
Water and Wastewater network capacity screening assessment by consultant or specialist. | Actual costs |
Wastewater, Stormwater and Water Connections | |||||||||
All “by quote” work includes a Council overhead component of between 4-6% | |||||||||
Wastewater, Stormwater and Water Connection/disconnection application fee | $340.00 |
Wastewater, Stormwater and Water connection/disconnection application hourly rate | Non-standard connections | per hour | $138.00 |
Catch pit connections | |||||||||
Larger Diameter Connections (>150mm) | by quote | ||||||||
Manhole Installation Required | by quote | ||||||||
Inspection fees | |||||||||
On site pipe location | by quote |
Water, wastewater and stormwater connection inspection fee for work completed by an approved contactor | Allows for 3 site visits | $330.00 |
Reinstatement | ||||||||||
Reinstatement of sealed roadways, footways and light vehicle entrances. | by quote | |||||||||
Third party damages | ||||||||||
Damage to services | Actual costs |
Stormwater and Wastewater connections | |||||||||
100mm Stormwater and Wastewater on Private Property | by quote | ||||||||
100mm Stormwater and Wastewater in the Transport Corridor | by quote | ||||||||
150mm Stormwater and Wastewater on Private Property | by quote | ||||||||
150mm Stormwater and Wastewater in the Transport Corridor | by quote | ||||||||
Water connections | |||||||||
Single service connection, 20mm | by quote | ||||||||
Single service connection, 25mm | by quote | ||||||||
Service connection , 50mm (multi unit residential only) | by quote | ||||||||
Single metered, 20 mm | by quote | ||||||||
Single metered, 25 mm | by quote | ||||||||
Single metered, 50 mm | by quote | ||||||||
Multi, 2*20 mm | by quote | ||||||||
Multi, 3*20 mm | by quote | ||||||||
Multi, 4*20 mm | by quote |
Water connections - additional charges | ||||||||||
Bacteria testing | per sample | $397.00 |
Catch pit connections | |||||||||
a) 300 diameter | by quote | ||||||||
b) full size catch pit for 2 or more properties | by quote |
Stormwater Pipes to Kerb and Channel (domestic only) | ||||||||||
1 pipe in trench $/m | per metre | by quote |
Modification of existing connection | |||||||||
Relocation of existing connection | by quote | ||||||||
Install flow restrictor | by quote | ||||||||
Consent to Enter | |||||||||
Basic processing of consent to enter | $368.00 |
Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis | per hour | $138.00 | ||||||||
Private systems | ||||||||||
All internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner | Actual costs |
Customer and Developer queries related to Three Waters connection feasibility and requirements | per hour | $240.00 |
Stormwater | ||||||||||
Inspection of high-risk facility | minimum charge | $608.00 | ||||||||
Enforcement of Stormwater Bylaw 2021 | Actual costs | |||||||||
Wastewater and Stormwater Disconnection | ||||||||||
Disconnection | by quote | |||||||||
Trade Waste | ||||||||||
Trade Waste Application Fees | ||||||||||
Permitted/Controlled Discharge | per application | $343.00 | ||||||||
Conditional Consent | per application | $805 |
Hourly rate for applications | per hour | $145.00 |
Temporary Discharge | per application | $343.00 |
Renewal Fee for Trade Waste Consents | per application | $145.00 |
Variation / Change of Details Request for Trade waste consents (plus additional hourly rate for more than 30 minutes time noting that site inspection charges may also apply) | Per request | $72.50 |
Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees | Actual costs |
Site Inspection Fees | |||||||||
Permitted Discharge - Site Inspection/Audit | per site visit | $229.00 | |||||||
Conditional Consent - Site Inspection/Audit | per site visit | $261.00 | |||||||
Temporary Discharge - Site Inspection/Audit | per site visit | $261.00 | |||||||
Non Compliance - Site Inspection/Audit | per site visit | $326.00 | |||||||
Quantity charge rates for Conditional Consent Holders | |||||||||
a) Flow Volume | per m3 | $2.36 | |||||||
b) Suspended solids | per kg | $1.02 | |||||||
c) Carbonaceous Biochemical Oxygen Demand (cBOD5) | per kg | $0.80 | |||||||
d) Total Kjeldahl Nitrogen | per kg | $2.32 | |||||||
e) Total Phosphorous | per kg | $8.14 | |||||||
f) Arsenic | per kg | $439.71 | |||||||
g) Chemical Oxygen Demand | per kg | $0.10 | |||||||
Annual Charge | |||||||||
Permitted/Controlled/Special/Tankered Discharge | annual fee | $262.00 |
Conditional/Special/Tankered Discharge - Risk Class 3 | annual fee | $2,297.00 |
Conditional/Special/Tankered Discharge - Risk Class 2 | annual fee | $1,393.00 |
Any temporary Discharge | annual fee | $259.00 |
Independent Monitoring (sampling and analysis) | per sample collected | Actual costs |
Tankered Waste Disposal | |||||||||||
Note: 1) Tankered waste may not be accepted at the Three Water Unit Director's sole discretion and, 2) Tankered Waste disposal to Wastewater Treatment Plant not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw, 3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate. | |||||||||||
Tankered Waste disposal to Wastewater Treatment Plant in accordance with Trade waste Bylaw schedule 1A and 1B. | per m3 | $91.00 |
Tankered waste administrative charge | annual fee | $892.00 |
Enforcement and penalties | |||||||
Actual costs | |||||||
As per agreement |
Wastewater, Stormwater and Water Connections | |||||||||
Inspection fee | |||||||||
Water, wastewater and stormwater connection additional inspection fee for connections undertaken by an approved contractor | Per hour | $138.00 |
Additional Planning Related Charges | ||||||||||
Service Plan Certification | ||||||||||
Service Connection Plan Certification and Vehicle Crossing Plan Certification | per hour | $248.00 |
Wastewater, Stormwater and Water Network Access Requests | |||||||||
Three waters network access request | per application | $123.00 | |||||||
Drinking water network shutdown request | per application | $198.00 | |||||||
Wastewater, Stormwater and Water Connections | |||||||||
Inspection fees | |||||||||
Wastewater, stormwater and water connection hourly inspection rate | per hour | $138 | |||||||
Wastewater, Stormwater and Water | |||||||||
Hourly rate | per hour | $138.00 |
Feedback
Last updated 6 July 2022