Water and Wastewater network capacity screening assessment by engineering team. | per hour | $215.00 |
Water and Wastewater network capacity screening assessment by consultant or specialist. |
Actual costs |
WASTEWATER, STORMWATER AND WATER CONNECTIONS | |||||||||||
All “by quote” work includes a Council overhead component of between 4-6% | |||||||||||
Wastewater, Stormwater and Water Connection application fee | per 2 hours | $310.00 |
Wastewater, Stormwater and Water Connection application fee | Non-standard connections | per hour | $125.00 |
Stormwater Bubble Up Connections | by quote | |
Larger Diameter Connections (>150mm) | by quote | |
Manhole Installation Required | by quote |
Inspection fees | ||||||||||
Closed Circuit TV Inspection | by quote | |||||||||
On site pipe location | $465.00 | |||||||||
Water, wastewater and stormwater connection inspection fee for connections undertaken by an approved contactor | $300.00 |
Reinstatement | |||||||||||
Reinstatement of sealed roadways, footways and light vehicle entrances. | by quote | ||||||||||
Third party damages | |||||||||||
Damage to services. | Actual costs |
Stormwater and Wastewater connections | ||||||||||
100mm Stormwater and Wastewater on Private Property | by quote | |||||||||
100mm Stormwater and Wastewater in the Transport Corridor | by quote | |||||||||
150mm Stormwater and Wastewater on Private Property | by quote | |||||||||
150mm Stormwater and Wastewater in the Transport Corridor | by quote | |||||||||
Water connections | ||||||||||
Single service connection, 20mm | by quote | |||||||||
Single service connection, 25mm | by quote | |||||||||
Service connection , 50mm (multi unit residential only) | by quote | |||||||||
Single metered, 20 mm | by quote | |||||||||
Single metered, 25 mm | by quote | |||||||||
Single metered, 50 mm | by quote | |||||||||
Multi, 2*20 mm | by quote | |||||||||
Multi, 3*20 mm | by quote | |||||||||
Multi, 4*20 mm | by quote | |||||||||
Water connections 50mm or greater - additional charges | ||||||||||
Bacteria testing | by quote | |||||||||
Pressure testing | by quote | |||||||||
Catch pit connections | ||||||||||
a) 300 diameter | by quote | |||||||||
b) full size catch pit for 2 or more properties | by quote |
Stormwater Pipes to Kerb and Channel (domestic only) | |||||||||||
1 pipe in trench $/m | per metre | $390.00 |
Modification of existing connection | ||||||||||
Relocation of existing connection | by quote | |||||||||
Install of flow restrictor | by quote | |||||||||
Upgrades of infrastructure to enable the connection | Actual costs | |||||||||
Consent to Enter | ||||||||||
Basic processing of consent to enter | $335.00 |
Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis | per hour | $125.00 | |||||||||
Private systems | |||||||||||
All internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner. | Actual costs | ||||||||||
Customer and Developer queries related to Three Waters connection feasibility and requirements | per hour | $215.00 | |||||||||
Stormwater | |||||||||||
Inspection of high-risk facility | per hour | $125.00 | |||||||||
Enforcement of Stormwater Bylaw 2021 | Actual costs |
WASTEWATER, STORMWATER AND WATER DISCONNECTIONS | ||||||||||
All “by quote” work includes a Council overhead component of between 4-6% | ||||||||||
Wastewater and Stormwater Disconnection | ||||||||||
Wastewater, Stormwater and Water disconnection application fee | $310.00 | |||||||||
Disconnection | by quote | |||||||||
Water service Disconnection | ||||||||||
20 - 50 mm diameter | by quote | |||||||||
Above 50 mm diameter | by quote | |||||||||
Fire mains | by quote |
TRADE WASTE | |||||||||||
Note: High users are subject to individual trade waste agreements | |||||||||||
Trade waste Application Fees | |||||||||||
Permitted/Controlled Discharge | $230.00 | ||||||||||
Conditional Consent | $425.00 | ||||||||||
Hourly rate for applications | per hour | $120.00 | |||||||||
Temporary Discharge | $230.00 | ||||||||||
Renewal Fee for permitted or conditional Trade Waste Consents | $120.00 |
Variation / Change of Details Request for permitted or conditional consents (plus additional hourly rate for more than 30 minute time noting that site inspection charges may also apply) | $60.00 | |
Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees | Actual costs |
Site Inspection Fees | |||||||||||
Permitted/Controlled Discharge - Site Inspection/Audit | per site visit | $170.00 |
Conditional Consent - Site Inspection/Audit | $250.00 | |
Temporary Discharge - Inspection/Audit | $250.00 | |
Site Inspection/Audit - Non Compliance | $255.00 |
Quantity charge rates for Conditional Consent Holders | |||||||||||
a) Flow Volume | per m3 | $1.85 | |||||||||
b) Suspended solids | per kg | $1.03 | |||||||||
c) cBOD5 (Organic loading) | per kg | $1.41 | |||||||||
d) Total Kjeldahl Nitrogen | per kg | $2.90 | |||||||||
e) Total Phosphorous | per kg | $10.76 | |||||||||
f) Arsenic | per kg | $369.54 | |||||||||
g) COD (Chemical loading) | per kg | $0.13 | |||||||||
Annual Charge | |||||||||||
Permitted/Controlled/Special/Tankered Discharge | annual fee | $65.00 |
Conditional/Special/Tankered Discharge - Risk Class 3 | annual fee | $1,735.00 |
Conditional/Special/Tankered Discharge - Risk Class 2 | annual fee | $1,015.00 |
Any temporary Discharge | annual fee | $230.00 |
Independent (Council) monitoring for consented trade waste discharges and tankered waste disposal at the Wastewater Treatment Plant (sampling and analysis) | per sample collected | $250.00 |
Tankered Waste Disposal | ||||||||||||
Note: 1) Tankered waste may not be accepted at the City Waters Manager's sole discretion and, 2) Tankered Waste disposal to Wastewater Treatment Plant or reticulation not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw, 3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate. | ||||||||||||
Tankered Waste disposal to Wastewater Treatment Plant or reticulation in accordance with Trade waste Bylaw schedule 1A and 1B | per m3 | $81.00 | ||||||||||
Tankered waste administrative charge | annual fee | $795.00 |
Enforcement and penalties | ||||||||||
Enforcement of Trade Waste and Wastewater Bylaw 2016 (e.g. tracing illegal discharge, cross connection remediation and clean-up, remediation of blockage) | Actual costs | |||||||||
Illegal discharge penalty charges | As per agreement |
Feedback
Last updated 6 July 2022